power lines
Home > Our projects > Special foundations projects > Power lines
2009-2012 –Power Line between La Coulée and Ducos
Project description :
Itinerant worksite to install 47 pylons along the power line linking La Coulée to Ducos. A large number of micro-piles were placed at an angle inhard-to- access conditions. Helicopters were used to transport the material and remove the specialised drilling equipment to and from certain zones. We carried out engineering work for each pylon on the massifs with precise adjustments of the supports to ensure conformity with the steel structure.
Client :
ENERCAL
Worsite supervisor :
ENERCAL
Location :
On the power line between La Coulée and Ducos
Cost of works :
251 000 000 FCFP
Expertise required :
Micro-piles, structural engineering and adjustments
Particularities of the project :
– Helicopter transport of equipment into certain zones with difficult access
– Itinerant worksite
– Preparation, anticipation and continual adaptation on this type of worksite