07-15-2020
Port Moselle extension
One of our foundation teams, specializing in pile driving, is currently working on the extension site of the Port Moselle marina, for SODEMO!
Arbé is driving 53 metal piles using a barge with a truss crane equipped with a hydraulic driving hammer. A driving guide specially designed for the site allows the tubes to be perfectly positioned and the work to be carried out safely.
Pontoon B is already over and our team is currently beating the pipes of the pontoon C.
The marina will accommodate 150 additional pleasure boats when finished.
More information: SODEMO extension works
Discover other maritime achievements of Arbé: here
Client: SODEMO
Design and supervision of building works : SEACOAST