12-05-2018
Industrial dock at La Coulée
In progress: Industrial Dock at La Coulée with implementation of a concrete framework.
Raising 11 meter high concrete poles for 9 tonnes with our Sennebogen 690 mobile crane.
8 poles posed in half a day thanks to a well-honed methodology and a powerful team!