2008 – COL BARRAU
Project description : 17 lots in Mont Dore with 8 months of work using several techniques: soil nailing and laying wire meshing, shotcreting, rainwater treatment plants, and construction of low walls. The difficult access of the worksite meant that some of the work was carried out using aerial platforms or acrobatics.
Client : FSH
Worksite supervisor : LBTP
Cost of works : 21 000 000 FCFP
2011 – VILLA IN UPPER ROBINSON
Project description : Drilling of 36 reinforcement nails -6 meters deep – with the Morath mast anchored before the bank and displaced using a winch on the slope, and then 210m2 of shotcreting was applied.
Client : Private person
Cost of works : 7 500 000 FCFP
2012 – CHAMBEYRONIA RESIDENCE (NOUMEA)
Project description : Reinforcement of a 600m2 bank on grounds where a new apartment building was to be built in the suburb of Normandie.
Client : FSH
Cost of works : 29 000 000 FCFP
2004 – LE BALLAH RESIDENCE (NOUMEA)
Project description : Reinforcement of 1500m2 of surface area using shotcrete in 2 zones:
Zone 1: recovery of a bank slide with P2 active anchors and shotcrete
Zone 2: reinforcement of an unstable bank with passive nails and concrete
Client : SUNSET PROMOTION
Worksite supervisor : LBTP
Cost of works : 125 000 000 FCFP