2008 – COL BARRAU

Project description : 17 lots in Mont Dore with 8 months of work using several techniques: soil nailing and laying wire meshing, shotcreting, rainwater treatment plants, and construction of low walls. The difficult access of the worksite meant that some of the work was carried out using aerial platforms or acrobatics.

Client : FSH

Worksite supervisor : LBTP

Cost of works : 21 000 000 FCFP

 

2011 – VILLA IN UPPER ROBINSON

Project description : Drilling of 36 reinforcement nails -6 meters deep – with the Morath mast anchored before the bank and displaced using a winch on the slope, and then 210m2 of shotcreting was applied.

Client : Private person

Cost of works : 7 500 000 FCFP

 

2012 – CHAMBEYRONIA RESIDENCE (NOUMEA)

Project description : Reinforcement of a 600m2 bank on grounds where a new apartment building was to be built in the suburb of Normandie.

Client : FSH

Cost of works : 29 000 000 FCFP

 

2004 – LE BALLAH RESIDENCE  (NOUMEA)

Project description : Reinforcement of 1500m2 of surface area using shotcrete in 2 zones:

Zone 1: recovery of a bank slide with P2 active anchors and shotcrete

Zone 2: reinforcement of an unstable bank with passive nails and concrete

Client : SUNSET PROMOTION

Worksite supervisor : LBTP

Cost of works : 125 000 000 FCFP