Hollow Augercast Piles

Home > Our projects > Special foundations > Hollow augercast piles

2011 – KNS, FOUNDATIONS FOR THE CONVEYOR BELT AND VARIOUS WORKS FOR THE MINE PLANT

Project description : Deep foundations along the 11 km of conveyor belt for the Northern nickel plant as well as various works on the mine site and on the site of the nickel plant. Over 650 reinforced full height piles (up to 17 metres deep) with difficult access and narrow and steep slopes.

Client : KNS

Worksite supervisor : Hatch Technip / KNS Project

Cost of works : 295 000 000 FCFP

 

2013 – SAS STOLL, DOCK LE FROID (PAÏTA)

Project description : 550 piles of 13 m average for the logistics centre of the Le Froid Company in Païta, including 78 reinforced full height piles

Client : Société Le froid

Worksite supervisor : Archi 13

Cost of works : 152 000 000 FCFP

 

2012 – SHERATON HOTEL AT GOUARO DEVA (BOURAIL)

Project description : 460 floating piles of a depth of between 6 and 14 metres were installed for this work site of the 4-star hotel at Gouaro Deva, located on a sandy area near the Poé Beach in Bourail.

Client : PROMOSUD

Worksite supervisor : SAMCO

Cost of works : 123 000 000 FCFP

 

2009 – FOUNDATIONS FOR THE LE PLEXUS COMMERCIAL CENTER IN DUCOS (NOUMEA)

Project description : 176 piles averaging 22 m, mainly large diameter for the Le Plexus Commercial Centre in Ducos, Noumea.

Client : EURL Plexus

Worksite supervisor : Kalinowski Promotion

Cost of works : 170 000 000 FCFP

SAS STOLL, Dock Le Froid

Sheraton Hotel at Gouaro Deva

Foundations for the Le Plexus Commercial Centre